9/13 - calendar of dates due
9/16 - background information, design brief, specs, limits, summer research/brainstorming, alternative solutions
9/20 - first log due
9/23 - rationale report, model
9/27 - testing procedure, weekly log
10/4 - weekly log
10/11 - weekly log
10/18 - weekly log
10/25 - weekly log, developmental work
10/30 - outline for formal presentation
10/31 - presentations begin
Day after presentation - mentor contacts
2 days after presentation - presentation reflection
Working Plan*:
9/13 - finish formatting blog; look over summer work and items due Monday; visit the NOAA lab to learn what technologies they already have in place; finalize calendar
9/14 - delineate specs and limits; create alternate solution based on trip to NOAA; work on background information
9/16 - finalize tank design; begin modeling the tank structure
9/16 - finalize tank design; begin modeling the tank structure
9/17 - preparation for informal presentation; continue modeling tank structure
9/18 - informal presentation; update blog
9/19 - begin rationale report; begin adding details and connections for Rob's system additions
9/20 - finish model of tank and add Rob's pump and systems
9/23 - research tank materials; update blog
9/24 - find possible weak points of the tank and add supports into the design
9/25 - begin formal drawings of the tank design
9/26 - explain the weeks work in a log; post testing procedure on blog
9/27 - begin looking at requirements for developmental work
9/30 - begin developmental work
9/30 - begin developmental work
10/1 - update mentor contacts; research materials to be used in connecting the systems to the tank
10/2 - continue working on developmental work and formal drawing of design
10/3 - explain the weeks work in a log; update blog
10/4 - collaborate with other horseshoe crab tank groups to see which direction they are working in
10/7 - finish formal drawings
10/8 - continue research on the needs of young horseshoe crabs
10/8 - continue research on the needs of young horseshoe crabs
10/9 - look into the average cost of materials to be used in design
10/10 - explain the weeks work in a log; update blog
10/11 - update mentor contacts; work on developmental work
10/15 - make sure systems properly connect with tank
10/17 - explain the weeks work in a log; update blog
10/18 - continue developmental work
10/23 - finish developmental work
10/24 - explain the weeks work in a log; update blog
10/25 - begin to outline formal presentation
10/28 - work on permal presentation and ensure everything needed for a presentation is available
10/30 - update mentor contacts
10/31 - formal presentations; update blog
*subject to change
*subject to change